Main Page  I  Northern  I  South  I  East  I  Central  I Sabah & Sarawak  I  Versi B. Melayu  I  BERNAMA.COM
 
 

Kampung Aring 5 residents repair water facility damaged by elephants


Last Update: 13/11/2019



GUA MUSANG, Nov 13 -- The Orang Asli from the Batik community in Kampung Aring 5 here conducted a gotong royong yesterday to repair a hill water catchment facility which was damaged by a herd of elephants since last week.

Kampung Aring 5 headman, Raina Anjang, 41, said the repair work took a whole day before the catchment could resume supplying clean water to the village last night.

He said the gotong royong had to be carried out by the residents to avoid a long delay in getting clean water for the village if the work was left entirely to the contractors to carry out.

However, he said, the residents could only temporarily patch up the leaking water catchment tank and reconnected broken water pipes to the villages using whatever materials available to prevent a clean water shortage at the village.

‘’We hope the Orang Asli Development Department’s (JAKOA) contractors will carry out a proper repair work as soon as possible,’’ he said when met in Kampung Aring 5, here today.

-- BERNAMA

 



 
 
 
 
 
 
 
 
 
     
   
 

Floods: KTMB to have bus services on standby

 
     

Dewan Negara: LPT2 records 246 fatal accidents since 2016

 
     

State Assembly: Perlis mulls banning polystyrene, plastic bags

 
     

PGA seizes contraband cigarettes worth RM666,866

 
     
 
     
 

.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .

 
     
     
   
   
     
     
     
   
     
   
     
 

 
© 2019 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy| Security Policy
This material may not be published, broadcast, rewritten or redistributed in any form except with the prior
written permission of BERNAMA. Best viewed in Firefox 35.0.1 & Internet Explorer 8.0 with 1024 x 768 resolution