COVID–19 NEWS   COVID: Malaysia records increase in new cases, fatalities - Dr Noor Hisham | New COVID-19 cases drop 5.2 pct last week - Health Dg  | Witness still COVID-19 positive, Ahmad Zahid's corruption trial postponed | Japan's daily COVID cases top 180,000, set fresh record amid 7th wave | Canada approves first coronavirus vaccine for 6-month to 5-year-olds | 
BUSINESS

DNeX unit takes delivery of vessel for North Sea Project

01/07/2022 05:58 PM

KUALA LUMPUR, July 1 (Bernama) -- Dagang NeXchange Bhd (DNeX), via its subsidiary Ping Petroleum UK PLC, has taken delivery of the Sevan Hummingbird Floating Production Storage and Offloading (FPSO) vessel from marine energy transportation company Teekay Corporation.

DNeX said the acquisition of the FPSO is a critical milestone in the Central North Sea Avalon Development Project, which the company continues to progress after receiving a letter of “no objections” from the North Sea Transition Authority (NSTA) in March this year for its proposed Avalon development plans.

It said Ping has also been recently granted a 19-month extension by NSTA to the second term of the P2006 licence containing Avalon and this allows the company additional time to optimise and gain full regulatory approval of the Avalon Field Development Plan.

“The proposed development concept includes plans to deploy the Sevan Hummingbird FPSO at the Avalon field which will be modified to facilitate electrification from an external low-carbon source.

“The company is evaluating options to connect the FPSO to a dedicated floating offshore wind turbine to power the facility, minimising diesel usage and associated greenhouse gas emissions,” it said in a statement today.

Besides, DNeX said the planned development allows Ping to expand and diversify its portfolio of producing assets in full compliance with the UK’s energy security and net zero targets.

Meanwhile, DNeX group managing director Tan Sri Syed Zainal Abidin Syed Mohamed Tahir said the acquisition of the Sevan Hummingbird FPSO is a key milestone for the Avalon oilfield and the group anticipates full operational deployment of the facility on Avalon by 2025.

“We have a tangible asset ready with the newly acquired Sevan Hummingbird.

“Our next step is to secure approval for our Field Development Plan, which will be submitted in the coming months,” he said.

First commissioned in 2008, the Sevan Hummingbird FPSO is a 60-metre diameter facility, which has a storage capacity of 270,000 barrels of oil and is capable of producing up to 30,000 barrels of oil per day, supporting up to 47 offshore personnel.

With a total estimated ultimate recovery of 23 million barrels of oil reserves over a period of 12 years, oil production from Ping’s second oilfield asset is expected to come onstream in 2025.

-- BERNAMA

 

TAGS: DNeX, Avalon, Ping Petroleum UK PLC, FPSO


ZFB ZFB CYC


Bernama is the trusted source of reliable real-time comprehensive and accurate news for both the public and media practitioners. Our news is published at www.bernama.com ; BERNAMA TV on: Astro Channel 502, unifi TV Channel 631, MYTV Channel 121 IFLIX; and Bernama Radio broadcasting locally on FM93.9 in Klang Valley, Johor (FM107.5), Kota Kinabalu (FM107.9) and Kuching (FM100.9).

Follow us on social media :
Facebook : @bernamaofficial, @bernamatv, @bernamaradio
Twitter : @bernama.com, @BernamaTV, @bernamaradio
Instagram : @bernamaofficial, @bernamatvofficial, @bernamaradioofficial
TikTok : @bernamaofficial

© 2022 BERNAMA   • Disclaimer   • Privacy Policy   • Security Policy